Plumbing and electrical basics

Pipes and wiring are hidden once the walls are plastered, so mistakes are costly to fix. These guides explain the pipe types and wiring basics used in Indian houses, and what to check before closing the walls.

Guides on this topic

  • Plumbing and electrical basics

    Water tank leakage: how to find the source and fix it

    How to tell if a water tank is really leaking, the IS 3370 level-drop test, common leak points, how concrete and plastic tanks are repaired, and when to call an engineer.

    Reviewed by Sumit Kumar Sinha ยท

Calculators for this topic

  • Calculator

    Water tank capacity calculator

    Estimate the daily water need of a house from the number of people, and the smallest standard tank that holds one day of it.

  • Calculator

    Septic tank size calculator

    Look up the septic tank size for toilet waste from the number of users and the cleaning interval, using the dimensions in IS 2470 (Part 1).

Other topics