Cement, concrete and steel

Cement, concrete and steel decide how strong and durable your structure is. These guides explain the cement types and grades sold in India, concrete mixes and reinforcement bars, and how to check materials on site, with Indian Standards cited by number.

Guides on this topic

  • Cement, concrete and steel

    Cement bags for a 1000 sq ft slab: a worked M20 example

    How many 50 kg cement bags, how much sand and aggregate a 1000 sq ft slab needs in M20 concrete, with the working, the assumptions and tables by thickness and area.

    Reviewed by Sumit Kumar Sinha ·

  • Cement, concrete and steel

    Cement, sand and aggregate per cubic metre: M5 to M20

    How much cement, sand and aggregate 1 cubic metre of nominal M5, M7.5, M10, M15 and M20 concrete needs, with the assumptions shown so you can check any quote.

    Reviewed by Sumit Kumar Sinha ·

  • Cement, concrete and steel

    Cement shelf life: how long can cement be stored on site?

    How long bagged cement stays usable, what the 3-month best-before date means, how to stack and cover cement on site under IS 4082, and what to do with lumpy stock.

    Reviewed by Sumit Kumar Sinha ·

  • Cement, concrete and steel

    How many 12 mm bars in 1 tonne? Weight per metre and a check

    A 12 mm bar weighs about 0.889 kg per metre, so 1 tonne is about 1,125 m or 94 rods of 12 m. Weight chart from 6 to 32 mm and how to check a steel delivery.

    Reviewed by Sumit Kumar Sinha ·

  • Cement, concrete and steel

    How many days to cure a concrete slab?

    How long a concrete slab should be kept wet, why cement type changes the days, how to cure by ponding or wet cloth, and a checklist for the mason on site.

    Reviewed by Sumit Kumar Sinha ·

  • Cement, concrete and steel

    OPC vs PPC vs PSC cement: which one for your house?

    How OPC, PPC and PSC cement differ in strength gain, heat and durability, and which one suits foundations, slabs and plaster.

    Reviewed by Sumit Kumar Sinha ·

  • Cement, concrete and steel

    Sand bulking: why damp sand gives you less sand

    What sand bulking is, why a measure of damp sand holds less sand, how to test it with a measuring jar, and how to correct the sand in your mix.

    Reviewed by Sumit Kumar Sinha ·

  • Cement, concrete and steel

    TMT bar full form and grades: what Fe500, Fe500D and Fe550D mean

    TMT stands for thermo-mechanically treated. What the process does to a steel bar, what the letters and numbers in Fe500, Fe500D and Fe550D mean, and who chooses.

    Reviewed by Sumit Kumar Sinha ·

Calculators for this topic

  • Calculator

    Cement, sand and aggregate calculator

    Estimate cement bags, sand and aggregate for a nominal-mix concrete slab, footing or beam from its size and mix grade.

  • Calculator

    Steel bar weight calculator

    Find the weight of reinforcement bars by diameter, length and number of bars, using the standard D squared over 162 formula.

Other topics